New West Sports Medicine Kearney NE

The New West facility has roughly 32,000 square feet, and among the included features are 24 exam rooms, four nurses stations, two x-ray rooms, MRI room, administrative of-fices and two casting rooms....

New Life Assembly, Kearney

The New Life Assembly Front Entry Addition project was a Design-Bid-Build project designed by Miller & Associates of Kearney. Lacy Construction Company was the low cost provider and re-ceived the cont...

Kearney Evangelical Free Church Addition

In June of 2009 Lacy Construction began pre-construction services with Kearney Evangelical Free Church (KEFC). The Sanctuary phase of the project included shoring and piling which required our skills ...

Infast USA Warehouse

The Infast USA warehouse project located in Grand Island was a new 100 x 150 fastener storage facility. The project is a 15,000 SqFt Pre-engineered metal building with an eave height of 24 feet to a...

GIPS Food Service Facility

The Grand Island Public School System realized an opportunity to improve their food services by consolidating meal preparation for all students. What they soon realized was the consolidation of the co...

CCC Main Corridor Remodel

Measuring 425 feet in length, the main corridor remodel for the Grand Island Campus of CCC, en-compassed approximately 10,000 square feet of space. Included in the project were five entry vesti-bules,...

CASE IH - WEST PLANT ADDITION

Lacy Construction constructed another project for a valued client, CASE IH, in Grand Is-land. Together, CASE IH plant engineering staff and Team Lacy combined our talents to de-sign a new 104,500 SqF...

Bethany Lutheran Church, Minden

In April of 2012, we began the multiphase project. Phase I was the addition to the Church. The addition included a new kitchen, accessible restrooms, two new classrooms and storage. The addition was b...

Anixter / Hastings Foods

With a total of 42,500 square feet to share, both Anixter Fasteners and Hastings Foods have room to spare. This project was delivered with a Design Build Lease package, sat-isfying both previous tenan...

10 Days of ICF Construction

Day One of ICF Installa-tion. Footers were in place and installation of ICF be- Day Two - Determining door and window opening locations......